For the swimming pool in Opava SUP-3 exchanger with three absorbers paralell at two levels connected in series was designed. During 8 hour of operation 40 000 liters of water is procesed . Warm waste water at 30 ° C is preheating the clean water from 10 ° C to about 19°C.
In operation since: december 2014
The amount of waste water: 40 000 l / day
Temperature of waste water: 30 ° C
Operation: 8 hour per day
The amount of clean water: 40 000 l / day
The temperature of the incomimg clean water: 10 ° C
The average energy savings: 52,3 kWh / hour